Project: Defence UGV Development

Client: Australian DoD

The Warfighter UGV was a codevelopment under a Defence Innovation Hub project with BIA5 and supported by Electro Optics Systems with Cyborg providing the vehicle control, autonomy and systems integration.

Scope: Concept → Low Run Production

The project involved the full systems engineering lifecycle taking the product from TRL 5 to TRL 8 over 18 months, with operational testing from Special Operations, Dismounted Combat and 1 Armoured Regiment.

The original BIA5 platform was a much smaller, lower speed system, which was made wider to support additional battery capacity, payload, new gearboxes and motors, and an autonomy pack.

The platform was developed to carry 50% of a sections stores and operate for 72 hours under standard infantry operations, whilst able to operate infantry and crew served weapons.

This resulted in a very lightweight platform relative to the payload, able to traverse extensive terrain and fully modular for payload attachment.

Full environmental testing was performed before handover of multiple systems to the Australian Defence Force. A number of these systems are still used in development units within defence.

Program evolution

Warfighter UGV Timeline

From early development to multi-platform deployments. Select a milestone to explore the journey.

Previous
Previous

Portable Waterproof Control Station

Next
Next

Athena Artificial Intelligence